Wednesday, February 29, 2012

Surplus variables

Surplus variables
In a linear programming model when a structural constraint is in the “Greater  than or equal to” form a non-negative variable is deducted to the left hand side to convert inequality into equation, then these variables are called as slack variables.
For example: 3X + 5Y ≤ 100
Or, 3X - S1 + 5Y - S2 = 100.
Here S1 and S2 are Surplus variables.
 

No comments:

Post a Comment